QUTA's the highest skill and test environment can meet various customer needs

Best Cases - Actual customer

The quickest respond to a failure by high retention of spare equipment. Apply to a systematic service and international quality standard to give our customer reliability. Support a total service from system design to operation

Tibero, a subsidiary of the biggest SW develpment company, Tmax, had a goal to develop the project to supply DBMS client as similar as possible with their client’s environment but was struggling due to budget issue. They asked us to supply below equipment

- IBM p750 3.0Ghz 32 Core 128GB Memory 7x ( 5 Nodes & 2 Nodes each HA configuration))
- NetApp Storage FAS3170 Dual Controller, Dual power 2 qty
- 20TB Storage(450GB 15K RPM FC HDD x22) 2 qty
- 4GB San switch 4 qty
- 10GB Ethernet configuration

3 weeks lead time seemed impossible but we sourced all these equipments through QUTA overseas partners and supplied after configuring to meet customer needs as 5 nodes & 2 node HA configuration then duplex configuration to NetApp Storage,San switch and internal network on time. We worked all these used equipment as duplex configuration to operate without down time and provide 2 year maintain service. We also have M-Sure basic service that maintain spare equipment and parts for replacement to response disability smoothly. It keeps our customer to use the equipment safely and reliable.

Famouse Domestic insurer,Hyundai Marine & Fire Insurance asked a rental equipment for IDC center transfer business. It was not easy situation to supply 8 sets of 6509E full set equipment.

WS-C3750G-24TS-E1U 2 qty
WS-C3560G-24TS-E 2 qty
CISCO3845 2 qty
NM-4T 8 qty
WS-C6509-E 8 qty(refer to below spec)
  • WS-C6509-E-FAN x 8
  • WS-SUP720-3B x 14
  • WS-X6716-10G-3C x 2
  • WS-X6708-10G-3C x 6
  • WS-X6748-SFP x 8
  • WS-X6724-SFP x 2
  • WS-X6748-GE-TX x 8
  • WS-SVC-NAM-2 x 2
  • WS-SVC-FWM-1 x 2
  • WS-CAC-6000W x 16

We expected the difficullty to source these equipment due to only 10 days lead time by order delay. Neither this project. The budget was not enought to carry this situation so no other company can precede this project.

All QUTA overseas staff both at head office and Japan/USA branches bought quickly the rest equipments except 509-E Equipment 2Set in stock. tested, supplied on time. Even we sourced spare equipment to back up the unexpected situation. All the process wen well from delivery to customer to collect.

The main reason to precede this high purchase pricing proejct is QUTA's overseas sales network that enable to resell equipment quickly after lease. So we can supply the equipment on a tight budget.

Futures trading system development company, Futurebrain, has developed brain OTC futures trading system for the system to be operational costs and to ensure stability of the system configuration was troubled. We suggested by suggesting the following system was delivered to our customers.

- Front - HP DL360G6 2.53Ghz 2 x QC 32GB Memory 2 qty (Linux Cluster HA configuration)
- FEP - HP DL360G6 2.53Ghz QC 32GB Memory 2 qty (Linux Cluster HA configuration)
- Back HP Storageworks 2012FC Dual Controller, Dual power 2 qty
- 3TB Storage(300GB 15K Rpm FC 4GB x 10)
- 4GB San switch 2 qty

Stability of the financial system, then the system than what the system configuration be a priority was La hadeorago than what all the equipment used equipment redundancy to operate the equipment without downtime had to be able to configure the OS to Linux systems, and for Front were alien to each HA Cluster configuration minimizes downtime. After you have installed the Oracle DB storage was configured with redundant backup DLT was also supported. Storage Controller and the delivery was San switch redundancy. You know has a spare equipment failure 24X7 engineers to support a seamless support system (M-sure Premium) also kept customers have been able to use the equipment safely.